TESKOOP Private Industrial Zone

Energy

A 33,300 m² substation area, 160 kVA of power per parcel and the 380 kV gas-insulated substation planned with TEİAŞ.

To secure a safe and sustainable power supply, a 33,300 m² Electricity Substation area was set aside at TESKOOP. Each parcel's power infrastructure was planned at 160 kVA.

33,300 m²Electricity substation
380 kVGas-insulated substation
160 kVAPower per parcel

380 kV Hadımköy Gas-Insulated Substation

TEİAŞ 380 kV step-down substation

The substation that meets the electricity needs of the zone and its surroundings was planned together with TEİAŞ.

Gas-insulated (GIS) technology takes up less space than a conventional open switchyard and is less affected by the weather.

Distribution

Power distribution and the transformer system are installed inside the zone. Medium and low voltage lines reach the parcels through the infrastructure gallery. Because the lines run in the gallery, faults can be fixed quickly and without excavation.

The substation and the surrounding industrial parcels
The substation and the surrounding industrial parcels

Connection process

Parcel owners apply for an electricity connection after project approval. The steps are explained on the electricity connection application page.