About the Zone
With 1,178,125 m² of land, 189 industrial parcels and a 73,000 m² expansion reserve, TESKOOP is one of Istanbul's planned production hubs.
With 1,178,125 m² of existing land, a 73,000 m² expansion reserve and 189 industrial parcels, TESKOOP Private Industrial Zone is on its way to becoming one of Istanbul's key production hubs. Taken together, the existing area and the expansion reserve give the zone a total development capacity of 1,251,125 m².
Alongside industrial production, energy, transport, logistics, security, social life and technical infrastructure were planned together. Factory parcels, the truck park, fire station, treatment plant, green areas and social amenities were positioned to complement one another.
A strong industrial area with room to grow

The 189 industrial parcels cover 776,360 m², about 66% of the zone.
Today 53 parcels are in active operation, covering 250,580 m². That means about 28% of the zone is active by number of parcels and about 32% by industrial area.
The picture shows a zone where production is already under way, with plenty of room for new investment.
TESKOOP in numbers
| Area | Size |
|---|---|
| TESKOOP total area | 1,178,125 m² |
| Expansion reserve | 73,000 m² |
| Total development capacity | 1,251,125 m² |
| Total industrial parcels | 189 |
| Total area of industrial parcels | 776,360 m² |
| Parcels in active operation | 53 |
| Area of active parcels | 250,580 m² |
| Electricity substation | 33,300 m² |
| Truck park | 13,000 m² |
| Roadside short-stay parking | 6,300 m² |
| Fire station area | 4,300 m² |
| Green space | 38,877 m² |
| Sports area | 5,450 m² |
| Treatment plant area | 3,000 m² |
| Cultural facility area | 24,000 m² |
| Mosque project area | 9,500 m² |
| Commercial parcel area | 5,000 m² |
Technical infrastructure
| Infrastructure | Length / Capacity |
|---|---|
| Total road length | 13,000 m |
| Road width | 12 / 16 m |
| Infrastructure gallery | 8,100 m |
| Power per parcel | 160 kVA |
| Wastewater line | 14,300 m |
| Stormwater line | 16,150 m |
| Natural gas line | 21,250 m |
| Drinking water line | 16,000 m |
| Fiber infrastructure | 17,250 m |
What sets the zone apart
Private Industrial Zone status
Declared by Presidential decree and managed under the coordination of the Ministry of Industry and Technology.
Toll gate inside the zone
The Northern Marmara Motorway connection road passes through the zone, and the toll gate is within its boundaries.
Gallery-based infrastructure
Energy and telecom lines run through an 8,100 m gallery, so maintenance needs no excavation.
Central truck park
A park for 110 trucks keeps heavy vehicles off the roadsides.
With 53 parcels already in production, TESKOOP has significant economic weight today, and its remaining parcels and expansion reserve give it strong growth capacity for new industrial investment.