Construction Permit
The construction permit process at TESKOOP: zoning status, soil survey, architectural and structural designs, fire department approval and building permit.
In the Private Industrial Zone, license, permit and approval procedures are carried out under the coordination of the Ministry of Industry and Technology. The process broadly involves these steps.
- Zoning statusA current zoning status certificate is obtained for the parcel. It is valid for 1 year.
- Soil surveyNo construction can start without a soil survey.
- DesignsPreliminary, architectural, structural, mechanical and electrical designs are prepared.
- Institutional approvalsISKI sewer design approval, thermal insulation report, fire department approval and a surveyed site sketch are obtained.
- Building permitThe designs are approved and the building permit is issued.
- Building inspectionAn authorized building inspection firm supervises the works throughout construction.
Points to watch in the designs
- Front setback at least 10 m, side and rear setbacks at least 5 m
- Maximum floor area ratio 1.50 and up to 3 storeys
- The regulation on buildings in disaster areas and the Istanbul Zoning Regulation
- Parking and shelter regulations