TESKOOP Private Industrial Zone

Eco-Friendly Industry

TESKOOP was planned in line with EIA rules. Sectors with no flue gas or harmful wastewater, separate sewerage, treatment and 38,877 m² of green space.

Only sectors that produce no flue gas or harmful wastewater and cause no environmental pollution operate at TESKOOP. The zone was planned in line with the EIA (Environmental Impact Assessment) Regulation.

38,877 m²Green space
3,000 m²Treatment plant area
SeparateStormwater and wastewater

Four pillars of our environmental approach

Sector selection

Facilities that pollute, or that produce or store flammable or explosive products, are not allowed.

Water management

Stormwater and wastewater run in separate lines. Wastewater is managed in the treatment plant area.

A green spine

A linear park along the stream and green areas spread across the zone.

Local employment

Proximity to residential areas cuts carbon emissions from commuting.

Environmental regulations we follow

Under the plan decisions, industrial areas comply with the following regulations:

  • Water Pollution Control Regulation
  • Solid Waste Control Regulation
  • Control of industrial and heating-related air pollution
  • Noise Control Regulation
  • Control of hazardous and medical waste
  • Control of harmful chemical products
  • Soil pollution
  • Environmental Impact Assessment Regulation
The linear park project
The linear park project