TESKOOP Private Industrial Zone

Building Permits

Building permit procedures at TESKOOP: zoning status, designs, institutional approvals and issuing the permit.

In the Private Industrial Zone, building permit procedures are carried out under the coordination of the Ministry of Industry and Technology.

  1. Zoning statusA current zoning status certificate is obtained.
  2. Soil surveyA soil survey report is prepared.
  3. DesignsArchitectural, structural, mechanical and electrical designs are prepared.
  4. Institutional approvalsISKI sewer design, fire department approval, thermal insulation report, surveyed site sketch.
  5. PermitThe designs are approved and the building permit is issued.

Additional documents for the permit application

  • Construction alignment survey
  • Level and section survey showing natural ground and road levels
  • Longitudinal and cross sections where required
  • Building inspection contract