TESKOOP Private Industrial Zone

Infrastructure Overview

An 8,100 m infrastructure gallery, 13 km of roads, 21,250 m of natural gas, 17,250 m of fiber and a 33,300 m² substation. TESKOOP's technical backbone.

At TESKOOP, energy, water, natural gas, telecom and transport infrastructure were planned and completed as a single system before any parcel was built on. Investors can start construction the day they receive their permit.

8,100 mInfrastructure gallery
13 kmRoad network
160 kVAPower per parcel
17,250 mFiber line
InfrastructureLength / Capacity
Total road length13,000 m
Road width12 / 16 m
Infrastructure gallery8,100 m
Power per parcel160 kVA
Wastewater line14,300 m
Stormwater line16,150 m
Natural gas line21,250 m
Drinking water line16,000 m
Fiber infrastructure17,250 m

The gallery system: maintenance without digging

Typical infrastructure detail at a parcel entrance

Energy, telecom and other technical lines run through an 8,100 m infrastructure gallery.

Repairs, maintenance and new connections need no road excavation. The lines stay orderly, accessible and easy to monitor.

Infrastructure at a glance

Energy

A 33,300 m² substation area and the TEİAŞ 380 kV gas-insulated substation.

Water and sewerage

16,000 m of drinking water, 14,300 m of wastewater and a separate 16,150 m stormwater line.

Natural gas

21,250 m of line, up to every parcel entrance.

Fiber and CCTV

17,250 m of fiber telecom infrastructure and security lines inside the gallery.

Internal roads and the gallery system
Internal roads and the gallery system