Infrastructure Overview
An 8,100 m infrastructure gallery, 13 km of roads, 21,250 m of natural gas, 17,250 m of fiber and a 33,300 m² substation. TESKOOP's technical backbone.
At TESKOOP, energy, water, natural gas, telecom and transport infrastructure were planned and completed as a single system before any parcel was built on. Investors can start construction the day they receive their permit.
| Infrastructure | Length / Capacity |
|---|---|
| Total road length | 13,000 m |
| Road width | 12 / 16 m |
| Infrastructure gallery | 8,100 m |
| Power per parcel | 160 kVA |
| Wastewater line | 14,300 m |
| Stormwater line | 16,150 m |
| Natural gas line | 21,250 m |
| Drinking water line | 16,000 m |
| Fiber infrastructure | 17,250 m |
The gallery system: maintenance without digging

Energy, telecom and other technical lines run through an 8,100 m infrastructure gallery.
Repairs, maintenance and new connections need no road excavation. The lines stay orderly, accessible and easy to monitor.
Infrastructure at a glance
Energy
A 33,300 m² substation area and the TEİAŞ 380 kV gas-insulated substation.
Water and sewerage
16,000 m of drinking water, 14,300 m of wastewater and a separate 16,150 m stormwater line.
Natural gas
21,250 m of line, up to every parcel entrance.
Fiber and CCTV
17,250 m of fiber telecom infrastructure and security lines inside the gallery.