Parcel selection at TESKOOP: choosing the right parcel by size, frontage, access, energy needs and zoning conditions.
The right parcel makes today's production easier and leaves room for tomorrow's growth. Things to consider when choosing:
Size
Today's needs and a 5 to 10-year growth plan. Minimum subdivision 2,500 m², 2,000 m² in A-coded areas.
Frontage and access
Direction of loading doors, truck manoeuvring and connection to main roads.
Topography
On sloping parcels, the first and second basement floors exposed by the slope can be occupied.
Energy
Connection capacity for facilities with high power demand.

- Review on the mapSee parcel locations on the interactive parcel map.
- Site visitInspect candidate parcels on site with our team.