Wastewater Management
TESKOOP wastewater management: 14,300 m of wastewater line, a separate system and a 3,000 m² treatment plant area.
Wastewater from the parcels is collected through a 14,300 m line. Stormwater is carried in a separate 16,150 m line.
14,300 mWastewater line
16,150 mStormwater line
3,000 m²Treatment plant area
Companies' obligations
- Complying with the legal limit values for wastewater discharge
- Pre-treating on site where required
- Not connecting stormwater to the wastewater line
- Keeping discharge permits and analysis reports up to date
Sectors that generate flue gas or harmful wastewater are not allowed in the zone.