TESKOOP Private Industrial Zone

Wastewater Management

TESKOOP wastewater management: 14,300 m of wastewater line, a separate system and a 3,000 m² treatment plant area.

Wastewater from the parcels is collected through a 14,300 m line. Stormwater is carried in a separate 16,150 m line.

14,300 mWastewater line
16,150 mStormwater line
3,000 m²Treatment plant area

Companies' obligations

  • Complying with the legal limit values for wastewater discharge
  • Pre-treating on site where required
  • Not connecting stormwater to the wastewater line
  • Keeping discharge permits and analysis reports up to date

Sectors that generate flue gas or harmful wastewater are not allowed in the zone.