A 3,000 m² treatment plant area, 14,300 m of wastewater line and a separate stormwater system at TESKOOP.
A 3,000 m² treatment plant area has been set aside at TESKOOP to manage wastewater in a controlled way. Rather than every facility building its own treatment plant, a shared system was planned.
3,000 m²Treatment plant area
14,300 mWastewater line
16,150 mSeparate stormwater line
How a central system helps investors
Lower investment
The cost of building and running a separate treatment plant at each facility falls.
Less space
Less of each parcel needs to be set aside for treatment.
Easier compliance
Compliance with wastewater discharge criteria is followed through the shared system.
Because the stormwater line is planned separately from the wastewater line, only wastewater reaches treatment and the system's capacity is used efficiently.