TESKOOP Private Industrial Zone

Water Connection & Subscription

Water connection and subscription at TESKOOP: drinking water connection, sewer connection and subscription procedures.

Drinking water and sewer lines have been brought to the entrance of every parcel. Connection and subscription procedures follow ISKI (Istanbul Water and Sewerage Administration) rules.

  1. Sewer designAn ISKI-approved sewer design is obtained at the building permit stage.
  2. ConnectionIn-parcel lines are connected to the entrance point connections according to the design.
  3. SubscriptionThe water subscription is opened after the occupancy permit.

Points to note

  • Stormwater and wastewater connections must be made separately.
  • Facilities using process water may need pre-treatment.