
Natural Gas Connection
Natural gas connection at TESKOOP: subscription, internal installation design, gas supply and inspections.
The zone's 21,250 m natural gas line has been brought to every parcel entrance. These are the steps to connect your facility to gas:
- Subscription applicationA subscription application is made to the gas distribution company.
- Internal installation designAn authorized company prepares the design and has it approved.
- InstallationThe internal installation is carried out according to the design.
- Inspection and supplyGas is supplied after leak tests and inspections.
For high process consumption, we recommend getting a technical opinion on connection capacity in advance.
